Bridlington Echo
  • Home
  • News
  • Family Announcements
  • Features
  • Public Notices
  • Sport
  • Announcements
  • Business Directory
No Result
View All Result
  • Home
  • News
  • Family Announcements
  • Features
  • Public Notices
  • Sport
  • Announcements
  • Business Directory
No Result
View All Result
Bridlington Echo
No Result
View All Result
Home News

Several Bridlington roads included in ERYC £3.5m road improvement programme this summer

Bridlington Echo by Bridlington Echo
14/04/2025
Share on FacebookShare on Twitter

Road improvements worth £3.5m are due to be carried out in the East Riding this spring and summer to help protect against potholes and other damage.  

Local roads include:

Bridlington Church Green
Bridlington Clarence Road
Bridlington Oxford Street
Bridlington Quay Road
Bridlington Sandsacre Avenue
Bridlington Sandsacre Drive
Bridlington Sandsacre Way
Bridlington St Andrew Road
Bridlington St Stephen Road
Bridlington St Thomas Road
Bridlington St Wilfred Road
Bridlington The Bolt
Bridlington Trentham Drive
Bridlington Marton Road
Burton Agnes Station Road
Carnaby

The highway maintenance programme will cover all types of roads: Photo: submitted.

East Riding of Yorkshire Council is investing the money in its annual surface dressing programme, which is set to begin on 23 April and is expected to take 13 weeks to complete, weather depending. 

The highway maintenance programme will cover all types of roads, from A roads to unclassified roads, and will see 151 sections of road in the area (around 67 miles) upgraded – which is the same as paving a straight road from Beverley to Nottingham. 

Advertisement

Around 12,600 tonnes of stone chippings will be laid on road surfaces during the spring and summer operation.  

Surface dressing is a fast and cost-effective method of fixing, preserving and prolonging the lifespan of a road, and it is 

out annually by the council’s own highways maintenance team. 

The process actively reduces the risk of potholes forming as it seals the road and stops water from entering and damaging the surface. Photo: Submitted.

The work consists of applying hot, adhesive bitumen to the road, covering it with chippings, and then rolling them in.  

Afterwards, road sweepers clear away any loose chippings after a few days. New road markings are then put down as quickly as possible. 

Advertisement

The process actively reduces the risk of potholes forming as it seals the road and stops water from entering and damaging the surface. It also greatly improves skid resistance for vehicles. 

The process is carried out during the spring and summer months as it requires warmer temperatures for the bitumen and chippings to take effect. 

Adam Holmes, the council’s director of infrastructure and facilities, said: “Thanks to residents and motorists for bearing with us while we carry out our annual surface dressing programme. 

During and after the work, temporary 20mph speed limits are in force on the treated roads. Photo: Submitted.

“Our teams will be out in around 150 locations over the next three months carrying out a vital job to help protect these sections of road from potholes and other damage.” 

Residents and motorists notified 

During and after the work, temporary 20mph speed limits are in force on the treated roads to reduce the possibility of vehicles skidding on the loose chippings and will be removed when the new road markings have been installed. 

http://www.yorkshirecoastfurniture.co.uk

Disruption to traffic will be kept to a minimum, but drivers are asked to respect the 20mph speed limit, in place to protect both the travelling public and the council’s workforce. 

Residents and drivers will be informed before the works begin. A leaflet will be sent to residents impacted by the works and advance warning signs will be placed on the roads beforehand. 

Loose chippings are recycled  

After the surfacing dressing is complete, any loose stone chippings left behind won’t go to waste.  

Advertisement

Mechanical road sweepers are used to collect up all the loose chippings, which are then stored.  

Then every two years the council hires a giant industrial washing and grading machine to clean all the loose chippings so they can be recycled and reused on the roads the following year.  

The process recycles more than 7,000 tonnes of chippings and saves around £60,000 of council tax payers’ money. 

Share this:

  • Share on X (Opens in new window) X
  • More
  • Share on Facebook (Opens in new window) Facebook

Like this:

Like Loading…
Tags: BridlingtonBritaincommunityEast RidingERYCprogrammesresortroadstourismtraditionaltransportvisitorsYorkshire
Bridlington Echo

© 2022 Bridlington Echo

Navigate Site

  • Home
  • News
  • Announcements
  • Public Notices
  • Lifestyle
  • Sport
  • Business Directory
  • Contact us
  • Complaints
  • Privacy Policy

Follow Us

No Result
View All Result
  • Home
  • News
  • Family Announcements
  • Features
  • Public Notices
  • Sport
  • Announcements
  • Business Directory

© 2022 Bridlington Echo

Loading Comments...
%d