From Saturday October 23 until Sunday October 31 buses will replace trains between Driffield and Seamer stations due to engineering works closing all the lines.
During this time services will be revised as follows:
Trains will run between Driffield, Beverley, Hull and York/Sheffield via Goole
There will be a bus replacement between Driffield, Nafferton, Bridlington, Hunmanby, Filey and Seamer for Scarborough calling at stations along the route.
If you are planning to travel over this period check times and allow for your journey to take longer than normal.
Network Rail are scheduled to replace track and signals along parts of the of route.
For further information: www.nationalrail.co.uk.
Below is a guide from Northern Rail of the approximate travel times using our rail replacement buses compared to the usual train journey times, including a 10-minute connection wait at Driffield in either direction:
Please note rail replacement buses are unable to carry:
- Heavy luggage
- Non-folding bicycles, prams or scooters
- Animals (other than registered assistance dogs).
Please note that hot food and drinks, alcoholic drinks cannot be consumed on bus services.
Rail replacement bus
Scarborough to Seamer
15min. Revised Bus Journey
5 min Usual Train Journey
Scarborough to Filey
35min
15 min
Scarborough to Bridlington
1h 22m
40 min
Scarborough to Beverley
2h 05m
1h 04m
Scarborough to Hull
2h 20m
1h 20m
Scarborough to Doncaster
3h 20m
2h 20m
Scarborough to Sheffield
3h 50m
2h 50m
Bridlington to Beverley
1h
20 min
Bridlington to Hull
1h 16m
40 min
Bridlington to Doncaster
2h 30m
1h 40m
Bridlington to Sheffield
2h 25m
2h 10m
Pictured. Bempton will be one of the railway stations affected by engineering works.

